August 18, 2018

Working with Hutchinson Builders we where given the chance to work on the new Melbourne Jet Base.  No expense was spared getting this facility over the line from everyone involved.

Fabricated stainless steel lettering that has been electroplated to look like aged bronze...

May 5, 2018

External and internal package completed down in Geelong for Lyons Construction.

Feature pylon sign, feature building sign and a full stat signage package throughout.

September 12, 2015

Partnering with ADCO constructions, we manufactured and installed the identification and way finding signage at Barkly Square in Brunswick.  Consisting of pylon signs, stainless steel LED feature letters, feature panelling throughout the centre and a number of differen...

March 3, 2015

Working directly with Canberra Institute of Technology, we delivered a full way finding packing to their campus in Canberra.

Consisting of a curved design these signs presented a challenge when being built but turned out great.  The package also included building signs,...

August 22, 2014

Working with Storage King, we delivered the external signage package for the new Tullamarine location.

We clad the building in aluminium frames, these were then clad with alucobond and acrylic fabricated logos.  Full of LEDs these logos light up brilliantly at night tim...

August 13, 2013

Alongside Claude Neon we upgraded the entrance to The Royal Women's hospital, installed a custom way finding signage throughout and installed a donors wall in the main foyer.

April 27, 2013

We worked closely with Leighton Contractors to help deliever The Royal Melbourne Hospital signage upgrade.

The hospital was in need of new signage throughout the entire facility, inside and out.  We helped design, manufacture and install the signage package with the hos...

August 16, 2012

We partnered with Hacer for the Pakenham Market Place build and were responsible for the signage package.  It consisted of lightboxes, window graphics, car park signs and all the internal way finding signage.

August 19, 2011

After months of hard work we are finally done at Burwood One shopping centre.  Working with Construction Engineering, we delivered the full signage package onsite consisting of pylon signs, light boxes, line marking, car park signs, fabricated LED letters, feature film...

June 2, 2010

Together with Mt Alexander Hospital, we helped design the signage package for the Castlemaine Hospital upgrade.

Consisting of lightboxes, pylon signs, garden signs and a full way finding package inside and out.

April 18, 2009

Together with QIC, we were responsible for the Water Gardens Shopping Centre signage package. 

The package consisted of all 6 new pylon signs standing at 12m tall, a full internal and external way finding signage package and wall and feature graphics throughout the cent...

Please reload

Recent Posts

December 19, 2018

November 14, 2018

August 18, 2018

May 5, 2018

April 24, 2018

September 26, 2017

December 2, 2016

September 12, 2015

May 4, 2015