December 19, 2018

Last job for the for 2018 and we certainly went out with a bang.  This is the freshly completed display suite for the 249QP Display Suite in Collingwood.

Consisting of 3D LED lettering, feature wall panels and acrylic "river" swoosh, hanging double sided fabric light bo...

December 4, 2018

Recently completed the internal fit out for Stage 1 of the new Orygen Youth Health building in Parkville for Kane Construction.

This project was a good challenge, consisting of many different elements of signage and building throughout.

We printed and installed over 3000...

November 14, 2018

Office fit out for The Boston Consulting Group on Collins St in the city.

Feature window banding with a custom UV printed pattern.  Unique wall mounted totem signs with a washed plywood feature panel and 6mm painted acrylic symbols, 10mm acrylic room names and a stat si...

October 17, 2018

Recently completed job for Grey Hound Racing Victoria.

Sometimes you can't use access equipment to get the job done because of power lines and other obstructions, by using rope access we were able to safely get the job done with minimal impact to the building residences...

August 18, 2018

Working with Hutchinson Builders we where given the chance to work on the new Melbourne Jet Base.  No expense was spared getting this facility over the line from everyone involved.

Fabricated stainless steel lettering that has been electroplated to look like aged bronze...

May 5, 2018

External and internal package completed down in Geelong for Lyons Construction.

Feature pylon sign, feature building sign and a full stat signage package throughout.

April 24, 2018

Just finished a really nice looking face lift for Cohealth Medical Centre on Hoddle St in Collingwood.

New fully clad ACM facia with digital printed graphics, new entrance way graphics for the freshly completed entrance,  4mm steel lettering on the garden bed, custom pr...

November 9, 2017

Working with Hansen Yunken, we have just completed the signage package for the Matheson Library upgrade at Monash Universities Clayton Campus.

The package was done in stages over the last 8 months, no expense has been spared with the new state of the art facility now op...

October 16, 2017

Working closely with CPB Builders over the last 6 months, we completed stage 2 of the Post Entry Quarantine (PEQ) facility on a Commonwealth owned site in Mickleham.  This state of the art facility is now operational for the import of bees, cats, dogs, horses and plant...

October 13, 2017

A nice high quick high impact signage job for a Friday.  Together with Plant Hire Solutions we came up with a package for their new factory in Tullamarine.

Feature window frost for the board room allowed for some subtle company branding in the office area while sti...

September 26, 2017

Working with Yarra Gym, we delivered some privacy frosting and one way vision graphics to the new gym they are opening in the Yarra Valley.

The design allows plenty of natural light to still get into the space.  The the one way vision gives privacy from the outside worl...

September 13, 2017

Partnering with Maxcon Construction, we built 4 building signs for The Chen development in Box Hill.  Consisting of 2 sky signs and 2 awning signs all made from mirrored stainless steel with LED lighting to either the front or rear of the letters.

The 2 Canopy signs are...

September 1, 2017

Working with the principle, the vice principle and school council, we were able to design a mixture of signage including fabricated 3D letters, wall panels and even fence panels to get the job done.

The use of colour and design techniques really makes these signs stand...

December 2, 2016

Some of the signs we did for the display suite for The Royce at the Penrith Panthers club in NSW.

The front sign was a set of mirror finish gloss painted alucobond panels with 3D lettering, it took a lot of work to get the panels that glossy!

Inside there was a 4m x 1.8m...

July 13, 2016

Working with Hanson Yunken, we delivered stage 1 & 2 of The Royal Victorian Eye and Ear upgrade.

The goal was to upgrade several areas of the hospital including the new emergency department and triage areas, level 5 - 7 and some back of house areas.  With new way findi...

Please reload

Recent Posts

December 19, 2018

November 14, 2018

August 18, 2018

May 5, 2018

April 24, 2018